Other Projects — Procurement
Al Samawa Great Pumping Station
Full procurement cycle for a 2,700 m³/h pumping station with six high-efficiency pumps and integrated M&E systems.

About the project
We oversaw the procurement cycle for a pumping facility with a capacity of 2,700 m³/h. This included evaluating commercial and technical proposals, managing logistics and LC, preparing BOQs, and reviewing designs. The station consists of six high-efficiency pumps, a thorough pipe/valve/fitting arrangement, and all necessary electrical and mechanical systems to provide maximum operating performance.
Key components
- Six high-efficiency pumps
- Integrated pipe, valve and fitting arrangement
- Electrical and mechanical systems for max operating performance
Al Amar scope
- Commercial and technical proposal evaluation
- Logistics and LC management
- BOQ preparation
- Design review

