Water Supply / Water Treatment

Fast Track Project

BOT water-treatment and distribution system delivering 350–750 KBWPD of injection water to the Al Zubair oil field.

Fast Track Project

About the project

A Build-Operate-Transfer (BOT) project designed to supply treated water for oil injection and extraction at the Al Zubair oil field, with a flow capacity ranging from 350 to 750 KBWPD.

Key components

  • Preliminary treatment via Lamella clarifiers
  • Primary treatment using Densadeg clarifiers (5,000 m³/hr capacity)
  • Sludge thickeners
  • Advanced treatment: UF, Reverse Osmosis (RO) and deaeration tower
  • Pumping station at MOD intake
  • 20 km GRP pipeline (DN 1000) to water-treatment plant
  • 1.2 km HDPE (DN 600) to DGS North
  • 7.2 km HDPE (DN 600) to HAMMAR IP

Al Amar scope

  • Subcontracting management
  • Engineering design coordination
  • Logistics planning and supply-chain management
  • Construction management and site supervision
  • Sub-vendor pre-qualification and bid evaluations
  • Technical and commercial assessments
  • Procurement coordination and stakeholder communication