Water Supply / Water Treatment
Fast Track Project
BOT water-treatment and distribution system delivering 350–750 KBWPD of injection water to the Al Zubair oil field.

About the project
A Build-Operate-Transfer (BOT) project designed to supply treated water for oil injection and extraction at the Al Zubair oil field, with a flow capacity ranging from 350 to 750 KBWPD.
Key components
- Preliminary treatment via Lamella clarifiers
- Primary treatment using Densadeg clarifiers (5,000 m³/hr capacity)
- Sludge thickeners
- Advanced treatment: UF, Reverse Osmosis (RO) and deaeration tower
- Pumping station at MOD intake
- 20 km GRP pipeline (DN 1000) to water-treatment plant
- 1.2 km HDPE (DN 600) to DGS North
- 7.2 km HDPE (DN 600) to HAMMAR IP
Al Amar scope
- Subcontracting management
- Engineering design coordination
- Logistics planning and supply-chain management
- Construction management and site supervision
- Sub-vendor pre-qualification and bid evaluations
- Technical and commercial assessments
- Procurement coordination and stakeholder communication